Mercedes Plant, Multiple Projects

The esteemed Mercedes Plant in Vance, Alabama, embarked on a major expansion designed to enable highly flexible production. CHA provided complete fire suppression system design, material, and commissioning services for multiple projects at the plant, including the massive BR167 body shop. The scope of work for BR167 was extensive, covering 1.3 million square feet of assembly area, including early suppression fast response (ESFR) systems at the roof level and installing sprinklers beneath multiple obstructions, along with pre-action type sprinkler systems.

Throughout the project's timeline, CHA relocated the water storage tank and existing fire pump room to new areas without causing any disruption to production or delays in the project schedule or system commissioning. Our team's diligent coordination ensured a smooth and successful implementation while keeping the production process running seamlessly.

Project summary

1.3M sf.

The assembly area was 1.3 million square feet.

0

Zero delays in production.

2

Two relocations – water storage tank and fire pump room.

Talk to an expert

Josh Crow

Josh Crow
Engineering, Procurement and Construction Business Line Director

Get in touch

Josh's focus throughout his decades-long career has been on giving clients the peace of mind knowing that their facilities are safeguarded by the best systems installed and inspected by the best people. He leads a team of certified technicians to provide various solutions for code-compliance, storage efficiencies, and cost-effective fire protection systems.